A deep understanding of wetlands and aquatic resources is critical for both large and small-scale construction projects involving land development and earth-disturbing activities.

KERAMIDA offers a full suite of ecological management and regulatory compliance consulting to help navigate your construction project from start to finish through Section 401 and 404 Clean Water Act compliance. 

Our clients range from commercial property owners to private businesses and large public entities. Our team of scientists are trained in ecology, biology, and soil science and are ready to tackle any environmental compliance hurdles your projects may face – no matter what the project size.

Our Environmental Compliance & Permitting Services include:

  • Wetland Delineations and Reporting

  • Delineated Wetlands and Streams Mapping and Survey

  • USACE Jurisdictional Determinations

  • Regulatory Permitting (USACE and State)

  • Agency Coordination

  • Unified Stream Methodology (USM) Stream Assessments for Mitigation Credit Determination

  • Mitigation Credit Coordination and Acquisition

  • Permit Compliance Inspections and Reporting

  • Threatened and Endangered Species Studies

  • NPDES/VPDES Compliance Inspections During Construction

  • Post-Construction Stormwater Management BMP Inspections, Inventory, and Compliance


Wetland Delineations and Reporting

Wetlands Field Delineation and Survey

KERAMIDA performs field delineations and reporting of Waters of the U.S. (WOTUS). Once field work is complete, a comprehensive wetland delineation report will be prepared which will be reviewed by regulatory agencies and will serve as a starting point in the permitting process.

Learn more about our Wetland Consulting Services ›


Delineated Wetlands and Streams - Mapping and Survey

Wetlands Field Delineation and Survey

To make the process even more efficient, we use highly accurate GPS receivers linked to our Mobile GIS Wetlands Delineation Application, saving time and effort in the field when locating stream and wetland limits. Our GIS specialists create detailed maps from data collected in the field which are added as a supplement to the final report.


USACE Jurisdictional Determinations

Understanding what aquatic features within your project will be regulated is an important element of site planning and design. During the permitting process we can request a Preliminary or an Approved Jurisdictional Determination from the USACE depending on the needs of your project.


Regulatory Permitting & Agency Coordination

KERAMIDA coordinates with Local, State, and Federal Agencies throughout the life of the project from initial project submissions, scheduling site walkovers with regulators, and permit acquisition, to project closeouts.


Unified Stream Methodology (USM) Stream Assessments for Mitigation Credit Determination

USM Stream Assessments

A USM Assessment is needed to determine a Reach Condition Index (RCI) value. This value determines compensatory mitigation credits needed for impacts to that stream reach.


Mitigation Credit Coordination and Acquisition

We work with private mitigation banks and The Nature Conservancy to acquire the credits your project might need.


Permit Compliance Inspections and Reporting

When impacts to waters are proposed on a project, monthly and bi-annual monitoring and reporting is required.


Threatened and Endangered Species Studies

Threatened and Endangered Species Studies

KERAMIDA can perform preliminary Threatened and Endangered Species Reviews. Once the preliminary assessment is complete and reviewed, we will work with a certified contractor should any further field studies need to be performed.


NPDES/VPDES Compliance Inspections During Construction

NPDES/VPDES Inspections and Wetland Impacts Monitoring During Construction

KERAMIDA offers third-party inspections during construction by certified Erosion and Sediment Control staff to keep your site in compliance with State and Federal regulations.


Post-Construction Stormwater Management BMP Inspections, Inventory, and Compliance

Post Construction Stormwater BMP Inspections

KERAMIDA provides comprehensive inspections of your post-construction stormwater management facilities. These inspections keep your assets in compliance and will point out any deficiencies that could eliminate large costly repairs in the future.


Related Services:


Related Resources:


Related Articles: